Launching SoonAllocated physical goldStored with Loomis in Dubai
eona

NEWS

Hot Chili Drills Shallow Copper-Gold at La Verde for Costa Fuego Plant

Company advances a satellite discovery in Chile aimed at supplying ore to a planned central processing hub to lower costs.

October 11, 2026

Hot Chili Drills Shallow Copper-Gold at La Verde for Costa Fuego Plant

Shallow Copper-Gold Discovery Positioned for Plant Feed

Hot Chili has reported shallow copper and gold mineralization from drilling at the La Verde discovery in Chile. The company’s stated objective is to use ore from La Verde to supply a planned processing plant at Costa Fuego, with the intent of reducing overall project costs.

While detailed assay data and engineering parameters were not disclosed here, the focus on shallow drilling indicates targeting of near-surface mineralization that can be tested and, if viable, potentially brought into an early-stage mine plan. Positioning La Verde as a source of ore for a centralized facility underscores a development pathway built around incremental feed and logistical proximity to shared infrastructure.

Hub-and-Spoke Cost Focus

Hot Chili’s strategy links La Verde to the planned Costa Fuego processing plant, a model that can concentrate capital in one facility while drawing ore from nearby deposits. By channeling La Verde material into a central plant, the company seeks savings on duplicated processing infrastructure and aims to optimize unit operating costs through scale and plant utilization.

A satellite-to-hub configuration can also offer mine-planning flexibility, allowing blending strategies and staged development as resource definition advances. For investors tracking construction timelines and capital allocation, the integration of satellite discoveries into a single processing route is a notable lever for managing upfront spending and operating profiles, contingent on resource delineation, permitting and commercial studies.

Next Steps and Context

The next milestones for La Verde within the broader Costa Fuego plan will depend on continued drilling, geological modelling and studies that assess the potential contribution of La Verde ore to the central plant. Progress will be measured by how the discovery is defined, how it fits into throughput assumptions for Costa Fuego, and the extent to which logistics support the intended cost outcomes.

The development approach signals continued industry emphasis on consolidating multiple deposits into centralized plants to balance capital intensity with operating efficiency. Market participants will be watching for further exploration updates, study results and sequencing decisions that clarify the role of La Verde in the Costa Fuego development pipeline.

Exploration and project-integration choices ultimately influence future mined supply, a relevant backdrop for those considering the role of allocated physical metal within diversified holdings.