Launching SoonAllocated physical goldStored with Loomis in Dubai
eona

NEWS

Endurance Gold Extends Zones at Reliance as PEA Work Continues

Recent drilling points to potential resource growth at the Reliance gold project while early-stage economic studies advance.

October 21, 2026

Endurance Gold Extends Zones at Reliance as PEA Work Continues

Drilling Update at Reliance

Endurance Gold reported that recent drilling at its Reliance gold project has expanded mineralized zones, reinforcing the potential to grow the project’s initial resource base. The company indicated that ongoing work is focused on incorporating these results as it advances a preliminary economic assessment (PEA) for the asset. While specific intercept details were not disclosed in this update, the expansion of defined zones is a key step that can support future resource updates and inform the scope of economic studies.

The latest campaign follows earlier work used to establish an initial resource for Reliance. Incremental growth through targeted drilling typically helps clarify continuity, geometry and grade distribution within mineralized envelopes. As the footprint of known mineralization extends, projects often gain optionality in subsequent mine-scenario evaluations.

PEA Progress and Project De‑Risking

The PEA process is designed to evaluate potential development pathways at a conceptual level, testing mine design approaches, processing routes and infrastructure concepts against the current geological model. Integrating new drill data during PEA preparation can refine assumptions on tonnage, grade and scheduling, improving the basis for trade-off decisions. Though a PEA is preliminary by definition and not a production decision, it is a pivotal milestone that frames the technical and economic levers for possible advancement to more detailed studies.

For Reliance, the combination of zone expansion and ongoing study work positions the project for iterative updates as datasets mature. Outcomes from a PEA commonly outline ranges for capital intensity, operating cost drivers and project sensitivities, highlighting where further drilling, metallurgical testing or engineering focus could add the most value. As with all early-stage assessments, the results remain contingent on future technical validation and market conditions.

Context for the Gold Project Pipeline

Exploration-stage gold assets that show the ability to extend mineralized zones while moving through study gates tend to attract closer scrutiny from capital providers, offtakers and strategic partners evaluating project scalability and timeline to potential development. For Endurance Gold’s Reliance project, the current sequence—resource establishment, drilling-led expansion, and PEA preparation—reflects a conventional path aimed at progressively de-risking a discovery.

While the extent to which recent drilling may translate into formal resource growth will be determined by future estimates and study outcomes, the present update underscores continued momentum at the project level. Exploration and study progress influence the prospective mine supply pipeline, which is distinct from the considerations involved in owning allocated physical bullion held in secure vaults.